Since May of 2013, when traffic was switched into head-to-head configuration on I-76 between Brush and Ft. Morgan, the entire stretch of the westbound highway has been rebuilt.  This includes 6 miles of new concrete paving, 250,000 CY of embankment dirt, 6 new bridges, two tier retaining walls at 5 of the new bridges and improved drainage along the entire...
more